Wuxi Luhuan Cleaning Machine Co., Ltd.
Products
Contact Us
  • Contact Person : Mr. Sales LuHuan
  • Company Name : Wuxi Luhuan Cleaning Machine Co., Ltd.
  • Tel : 86-510-85607793
  • Fax : 86-510-85607717
  • Address : Jiangsu,Wuxi,Xin'an Industrial Zone, New Economic Development Zone, Wuxi City, Jiangsu Province. China
  • Country/Region : China
  • Zip : 214135

painting and drying room

painting and drying room
Product Detailed
Related Categories:Spray Booths
Liquid painting booth for heavy industry

Paint and drying room structure

      Paint and drying room is composed of room body, air supply system, exhaust system, air filtration system, paint mist treatment system, organic exhaust treatment system, heating system, workpiece ground-chain conveying system, interior hoist, safety alarm system, lighting system, electrical control system. Fire fighting system is supplied by customer themselves.

Technical parameters

External Size: (mm)

7000x5450x3480

Front Door: (mm)  Aluminum Frame

  3000(w)x2750(h)

  Internal Size: (mm)

6900x3900x2800

Total Power: (kw)

  16

 

Cabin System

Wallboard

Sandwich style EPS (epispastics polystyrene) 50mm thickness. Colorful steel skin boards 0.426mm thickness. Galvanized steel roof panel.

Basement

Galvanized steel sheet and square steel pipe construction. 2 rows of grids with floor filter & 3 rows of checkered plates. 2 pcs of ramps.

Air Circulation System

Intake Fan

2x4kw intake fan. BELIMO 20N electric damper.

Exhaust Fan

1x5.5 kw exhaust fan. Multi-layer fiberglass filter.

Air Flow: 24000. m3 /h. Air Speed: 0.3-0.5m/s.

Air Purification System

Dual filtering structure. The primary filter can capture granules larger than 10μ m. Ceiling filter capture granules bigger than 5μ m. The air cleanliness in the working environment can reaches 98%.

Heating System

Burner

Italy Riello G20 diesel burner, 200000Kcal/h. The heating time 5-7min(20-60 ° C). Max temperature at 80° C. Fuel consumption is 4-5kg/vehicle.

Heat Exchanger

Made of stainless steel. The heat exchange rate reaches 85%.

Lighting System

Ceiling light has 24 pcs of 36w lamps. Side light has 16 pcs of 36w lamps. 900 Lux.

Other

Spare parts holding bar at the rear

painting and drying room



Copyright Notice @ 2008-2022 ECBAY Limited and/or its subsidiaries and licensors. All rights reserved.